Cell-com has their manufacturing facilities at Sikandrabad, U.P. (just 50 km away from Delhi)Spread over the area of 40,000 sq.m., having an installed Fabrication Capacity of 30,000 MT/ Annum for Galvanized & Non Galvanized Steel Structures.

 

Galvanizing Plant:

  • State of the art Galvanizing Plant with Zinc Bath size 7.5 M x 1.2 M x 1 M (Capacity - 18,000 MT/Annum).

     

     

 

Electro-Forged Grating Plant:

  • Modern semi-automatic computerized Electro-Forged Grating Plant of 12,000 MT Annual capacity to manufacture High quality Electro-forged gratings as per BS 4592-1 2006.

 

 

Plates Cutting Shop:

  • State-of-the-art Messer Make CNC Plate cutting machine with cutting width of 3 M and cutting length of 10 M - having one Oxy-cutting Fuel Torch and one Plasma cutting Torch
  • NC Hydraulic shearing machine for up to 10 mm thick and 3000 mm width plates shearing
  • Plate rolling machine for up to 25 mm thick and 2500 mm width plates.
 

Fabrication Shop:

  • Equipped with adequate nos. of MIG welding machines, Arc welding machines, Submerged Arc welding machines, Electrodes baking oven, Radial Drill machine, Pillar Drill Machines and Magnetic Drill Machines.

 

 

Press Shop:

  • Hydraulic and Mechanical Power Presses up to 250 tons capacity and 200 tons capacity Hydraulic Angle bending machine.

 

 

 

Machine Shop:

  • Equipped with 8 feet & 10 ft bed-length Lathe Machines, Surface Grinder, Milling Machine, Chaser m/c for up to 63 mm diameter threads and Thread Rolling m/c for up to 80 mm diameter threads.

 

 
Shot Blasting, Sand Blasting & Painting Shop:
  • Mechanical Recovery Blasting Chamber 7.5m x 4m x 4m, along with complete Blasting Equipments, Cyclone Dust Collector & Compressor.

 

 

 
Mobile & Overhead Cranes:
  • Mobile / Over head cranes of 5 tons & 10 tons capacity for efficient movements of Raw Material, In-Process & Finished goods.
  • Goliath Crane of capacity 80 MT for Heavy fabrication work.

 

 
State-of-the-art Effluent Treatment Plant:

Power Supply / Back-up:

  •  Dedicated 33KVA feeder from U.P. Electricity Substation to the factory. The connected load is 1600 KVA.
  • Additionally, power back-up of 600 KVA available from DG sets.
 